RMS English
بازگشت به همه تمرین‌ها
تمرین تألیفی شبیه‌ساز

مهندسی عمران | تمرین ۱

فنی و مهندسی · 259 واژه · 5 سؤال

شناسنامه تمرین

دشواری تخمینی: متوسط

واژگان دانشگاهی عمومی؛ سطح اولیه برآوردی و نیازمند تأیید بازبین

الگوی طراحی: تألیف مستقل با الگوبرداری از تیپ سؤال‌های نمونه‌های ارسالی ارشد و دکتری؛ بدون اقتباس جمله‌ها یا ادعای تأیید رسمی.

آخرین بازبینی انتشار: 2026-10-26

ارشد وزارت علوم

بازبینی محتوایی توسط هوش مصنوعی؛ تأیید رسمی یا هم‌ارزی آماری با آزمون ادعا نمی‌شود.

متن انگلیسی

The age of a bridge can be a convenient starting point for planning inspections, but bridges of the same age need not face the same demands or exhibit the same pattern of deterioration. Traffic conditions, exposure to water, earlier repairs, and the details of construction can influence what an inspector should look for and how urgently a particular observation requires attention. A schedule based on age alone may consequently assign similar effort to structures whose actual inspection needs differ substantially, while giving insufficient attention to the reasons for those differences.

Consider two imagined bridges completed in the same year, one carrying frequent heavy traffic near a watercourse and the other serving a lightly used route in a different environment. Their shared completion date is relevant background information, yet it does not establish that the same components should receive equal attention or that observations have identical practical implications. An inspection strategy should connect the record of a structure with the conditions affecting it, rather than treating the date as a substitute for examining its circumstances.

Prioritizing work also requires separating the likelihood of a problem from the consequences should it occur, since a relatively uncommon event may still deserve serious consideration when its effects would be severe. Such reasoning supports an explicit account of why one inspection is advanced or expanded, allowing decisions to be reconsidered when new information changes the assessment. It does not provide a universal timetable; it provides a way to make the basis of inspection priorities clearer and more responsive to the particular structures under consideration.

ترجمه پس از نمایش پاسخ تشریحی در دسترس است. ابتدا مستقل تلاش کنید.

سؤال‌ها

امکان مشاهده پاسخ تشریحی بدون پاسخ دادن نیز وجود دارد.

پاسخ‌ها روی همین مرورگر ذخیره می‌شوند.